Physical Design
1.Temperature and Humidity guidelines : 64 - 80°C roughly 40 - 60 %
2.HVAC consideration:redundancy,energy efficient,filtration.
3.Air management: air should be able to circulate freely.
4.Cable management: Under floor or overheard can leave hotspots due to poor circulation.
5.Aisle separation and containment Hot/cold aisles.
Infrastructure
1.Flexible and efficient
2.Faster deployment of resources.
3.Higher application service levels
4.Less administrative overhead.
5.Lower infrastructure,energy and facility costs.
6.Increased security
7.Servers.
8.Storage
9.Network
10.Management
11.Security
12.Backup and Recovery
13.Infrastructure system
0 Comments